Project Scope:

  • 1800 cubic meter/hr gas filtration and metering station;
  • 1500 cubic meter/hr gas filtration, reducing and metering station;
  • 300 cubic meter/hr filtration, reducing and metering station;
  • 2000 meter DN 160 mm PE100, SDR11 gas pipeline construction;