Grigoleti-Qobuleti Asphalt and Concrete facility – 1800 Cubic Meter/hr Gas Supply
Project Scope:
- 1800 cubic meter/hr gas filtration and metering station;
- 1500 cubic meter/hr gas filtration, reducing and metering station;
- 300 cubic meter/hr filtration, reducing and metering station;
- 2000 meter DN 160 mm PE100, SDR11 gas pipeline construction;