Batumi Bypass Road Construction Project – Low pressure Gas Pipelines

Awesome Image
Awesome Image

Batumi Bypass Road Construction Project – Low pressure Gas Pipelines

Project Scope include designing, relocation and construction works at:

  • Highway construction area from 12+800 km to 13+000 km (existing medium pressure pipeline – DN90m) in Batumi, from Pridon Khalvashi avenue to village Makhvilauri turn;
  • Highway construction area from the 11+900 km to 12+120 km (existing DN 90 mm, DN 63 mm, DN 40 mm underground polyethylene pipelines, poles and DN 50 mm steel pipeline) in Batumi, village Makhvilauri;
  • Highway construction area from 11+660 km to 11+900 km (existing DN 90 mm, DN 63 mm underground polyethylene pipelines, poles and DN 50 mm steel pipeline) in Batumi, Makhvilauri street;
  • Highway construction area from 9+000 km to 9+120 km (existing DN 100 mm, DN 50 mm steel pipelines) in Khelvachauri Municipality, village Peria;
  • Highway construction area from 8+700 km to 8+800 km (existing DN 50 mm steel pipeline) in Khelvachauri Municipality, village Peria;
  • Highway construction area from 7+400 km to 7+520 km (existing DN 160mm,  DN 110mm, DN 63mm, DN 40mm  underground polyethylene pipelines, poles and DN 100mm,  DN 50mm, DN 32mm steel pipelines)  in Batumi, Nijaradze str (nearby to the military settling);
  • Highway construction area from 5+660 km to 5+800 km (existing DN 500 mm high pressure steel pipeline) in Khelvachauri Municipality, village Salibauri;
  • Highway construction area from 5+100 km to 5+300 km (existing DN 90mm, DN 63mm underground polyethylene pipelines and DN 50 mm pipeline) Khelvachauri Municipality, village Salibauri;
  • Highway construction area from 4+080 km to 4+120 km (existing medium pressure pipeline DN 200 mm and DN 150 mm pipelines) in Khelvachauri Municipality, village Gantiadi;
  • Highway construction area from 3+580 km to 3+580 km (existing DN 75 mm underground polyethylene pipeline and DN 50 mm pipeline) in Khelvachauri Municipality, village Gantiadi;
  • Highway construction area from 1+800 km to 2+020 km (existing DN 100mm and DN 50 mm steel pipelines) in in Khelvachauri Municipality, village Makhinjauri;
  • Highway construction area from 0+540 km to 0+800 km, in Batumi, Tbilisi, Krasnovi and Iberia streets.