Batumi Bypass Road Construction Project – High pressure Gas Pipelines
Project Scope:
- Project design for the relocation of 200 mm high pressure gas pipeline from the Batumi Bypass Road (highway) construction area – highway construction section 4+080-km -4+120 km.
- Project design for the relocation of 500 mm high pressure gas pipeline from the Batumi Bypass Road (highway) construction area – highway construction section 5+600-km – +800 km.
Project Info
- Clients
- Date
- Category
- Location