Grigoleti-Qobuleti Bypass Road Construction Project – Water Systems
Project Scope:
- Designing and Construction of 5500 meter water systems;
- Relocation of DN 700: 2700 meter water pipes
- Relocation of DN 355: 1000 meter water pipes.
- Relocation of DN 160: 400 meter water pipes
- Relocation of DN 110: 1500 meter water pipes.
Project Info
- Clients
- Date
- Category
- Location